Leaves on the Line

Oxenholme Lake District

OXN North West route
CSV JSON

864 delay minutes

The biggest share (39%) of the delay picked up at Oxenholme Lake District in the four weeks to 9 December 2023 came from faulty trains.

63% of these minutes were knock-on from something that happened elsewhere first. 72% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power749%16% 3 a day, more than 1 of the other 4 years1
Weather and structures13616%7% 5 a day, more than 3 of the other 4 years13
Autumn233%7% 1 a day, more than 3 of the other 4 years-
External6<1%4% 0 a day, the least in 5 years1
Network management485%17% 2 a day, more than 1 of the other 4 years4
The operators' causes
Train faults33939%16% 12 a day, more than 3 of the other 4 years4
Traincrew779%11% 3 a day, more than 3 of the other 4 years13
Stations506%3% 2 a day, more than 3 of the other 4 years1
Operations516%5% 2 a day, more than 3 of the other 4 years-
Operator, other627%7% 2 a day, more than 3 of the other 4 years3

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)117
MBElectic Loco failure, defect, attention105
XTSevere snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy)71
M8Technical failures above the Solebar39
TH(Senior) Conductor/Train Manager39
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure38
MPRail / wheel interface, adhesion problems (including ice on the running rail)32
TGDriver32
MNBrake and brake systems faults; including wheel flats where no other cause had been identified26
IBPoints failure (including no fault found)20
Since 2018
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail4,592
TGDriver2,590
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions2,176
ICTrack circuit failure (including no fault found)2,101
MDTechnical failures below the solebar1,755
IBPoints failure (including no fault found)1,475
I1Overhead line/third rail defect1,425
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)1,414
M8Technical failures above the Solebar1,064
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,033