Oxenholme Lake District
864 delay minutes
The biggest share (39%) of the delay picked up at Oxenholme Lake District in the four weeks to 9 December 2023 came from faulty trains.
63% of these minutes were knock-on from something that happened elsewhere first. 72% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 74 | 9% | 16% | 3 a day, more than 1 of the other 4 years | 1 |
| Weather and structures | 136 | 16% | 7% | 5 a day, more than 3 of the other 4 years | 13 |
| Autumn | 23 | 3% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 6 | <1% | 4% | 0 a day, the least in 5 years | 1 |
| Network management | 48 | 5% | 17% | 2 a day, more than 1 of the other 4 years | 4 |
| The operators' causes | |||||
| Train faults | 339 | 39% | 16% | 12 a day, more than 3 of the other 4 years | 4 |
| Traincrew | 77 | 9% | 11% | 3 a day, more than 3 of the other 4 years | 13 |
| Stations | 50 | 6% | 3% | 2 a day, more than 3 of the other 4 years | 1 |
| Operations | 51 | 6% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 62 | 7% | 7% | 2 a day, more than 3 of the other 4 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 117 |
| MB | Electic Loco failure, defect, attention | 105 |
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 71 |
| M8 | Technical failures above the Solebar | 39 |
| TH | (Senior) Conductor/Train Manager | 39 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 38 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 32 |
| TG | Driver | 32 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 26 |
| IB | Points failure (including no fault found) | 20 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 4,592 |
| TG | Driver | 2,590 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 2,176 |
| IC | Track circuit failure (including no fault found) | 2,101 |
| MD | Technical failures below the solebar | 1,755 |
| IB | Points failure (including no fault found) | 1,475 |
| I1 | Overhead line/third rail defect | 1,425 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 1,414 |
| M8 | Technical failures above the Solebar | 1,064 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,033 |