383 delay minutes
Most of the delay picked up at Oxford Parkway in the four weeks to 9 December 2023 came from signal, points and power faults.
13% of these minutes were knock-on from something that happened elsewhere first. 46% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 8 | 2% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 213 | 56% | 16% | 8 a day, the most in 5 years | 1 |
| Weather and structures | 4 | 1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 5 | 1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 57 | 15% | 17% | 2 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 37 | 10% | 16% | 1 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 34 | 9% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 8 | 2% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 10 | 3% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 7 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IJ | AWS/ATP/TPWS/Train stop/On track equipment failure | 203 |
| TG | Driver | 34 |
| OU | Delays not Investigated by Network Rail | 20 |
| ZU | No Cause Identified After investigation by both Parties | 12 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 11 |
| MT | Confirmed train borne safety system faults (not cab based) | 11 |
| M7 | Door and Door system faults | 10 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 10 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 7 |
| M8 | Technical failures above the Solebar | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,192 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,102 |
| MD | Technical failures below the solebar | 922 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 769 |
| J3 | Axle Counter Failure | 721 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 675 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 524 |
| IB | Points failure (including no fault found) | 464 |
| M8 | Technical failures above the Solebar | 460 |
| ZU | No Cause Identified After investigation by both Parties | 399 |