The biggest share (29%) of the delay picked up at London Paddington in the four weeks to 9 December 2023 came from track faults.

77% of these minutes were knock-on from something that happened elsewhere first. 79% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track4,49229%8% 160 a day, the most in 5 years44
Signals, points and power2,52816%16% 90 a day, more than 3 of the other 4 years129
Weather and structures6614%7% 24 a day, the most in 5 years17
Autumn82<1%7% 3 a day, more than 3 of the other 4 years-
External1591%4% 6 a day, more than 1 of the other 4 years-
Network management2,69217%17% 96 a day, the most in 5 years261
The operators' causes
Train faults2,54616%16% 91 a day, more than 3 of the other 4 years145
Traincrew1,51110%11% 54 a day, more than 3 of the other 4 years109
Stations123<1%3% 4 a day, more than 3 of the other 4 years-
Operations4153%5% 15 a day, the most in 5 years7
Operator, other3532%7% 13 a day, more than 3 of the other 4 years4

Period by period

Delay minutes a day, period by period. Gridlines every 200 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,531
OUDelays not Investigated by Network Rail2,073
IRBroken/cracked/twisted/buckled/flawed rail1,532
TGDriver1,358
IBPoints failure (including no fault found)886
I1Overhead line/third rail defect782
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure561
ITRough ride or bumps reported - cause not known or no fault found392
M2Delay due to ATO / ETCS equipment367
MNBrake and brake systems faults; including wheel flats where no other cause had been identified364
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver36,526
IBPoints failure (including no fault found)20,502
M8Technical failures above the Solebar17,946
J3Axle Counter Failure15,562
I1Overhead line/third rail defect14,575
MDTechnical failures below the solebar14,046
ICTrack circuit failure (including no fault found)13,790
M2Delay due to ATO / ETCS equipment13,395
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.13,173
MUDepot operating problem12,607