London Paddington
15,560 delay minutes
The biggest share (29%) of the delay picked up at London Paddington in the four weeks to 9 December 2023 came from track faults.
77% of these minutes were knock-on from something that happened elsewhere first. 79% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4,492 | 29% | 8% | 160 a day, the most in 5 years | 44 |
| Signals, points and power | 2,528 | 16% | 16% | 90 a day, more than 3 of the other 4 years | 129 |
| Weather and structures | 661 | 4% | 7% | 24 a day, the most in 5 years | 17 |
| Autumn | 82 | <1% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | 159 | 1% | 4% | 6 a day, more than 1 of the other 4 years | - |
| Network management | 2,692 | 17% | 17% | 96 a day, the most in 5 years | 261 |
| The operators' causes | |||||
| Train faults | 2,546 | 16% | 16% | 91 a day, more than 3 of the other 4 years | 145 |
| Traincrew | 1,511 | 10% | 11% | 54 a day, more than 3 of the other 4 years | 109 |
| Stations | 123 | <1% | 3% | 4 a day, more than 3 of the other 4 years | - |
| Operations | 415 | 3% | 5% | 15 a day, the most in 5 years | 7 |
| Operator, other | 353 | 2% | 7% | 13 a day, more than 3 of the other 4 years | 4 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,531 |
| OU | Delays not Investigated by Network Rail | 2,073 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,532 |
| TG | Driver | 1,358 |
| IB | Points failure (including no fault found) | 886 |
| I1 | Overhead line/third rail defect | 782 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 561 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 392 |
| M2 | Delay due to ATO / ETCS equipment | 367 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 364 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 36,526 |
| IB | Points failure (including no fault found) | 20,502 |
| M8 | Technical failures above the Solebar | 17,946 |
| J3 | Axle Counter Failure | 15,562 |
| I1 | Overhead line/third rail defect | 14,575 |
| MD | Technical failures below the solebar | 14,046 |
| IC | Track circuit failure (including no fault found) | 13,790 |
| M2 | Delay due to ATO / ETCS equipment | 13,395 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 13,173 |
| MU | Depot operating problem | 12,607 |