Leaves on the Line

Parbold

PBL North West route
CSV JSON

0 delay minutes

No delay was picked up at Parbold in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
M0Confirmed train cab based safety system fault (including GSMR)59
TGDriver30
M8Technical failures above the Solebar26
Q3NZ Pumps T25
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)25
TTLeaf fall Neutral24
MNBrake and brake systems faults; including wheel flats where no other cause had been identified16
M7Door and Door system faults12
MCDiesel Loco failure, defect, attention10
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)9