Paddock Wood
820 delay minutes
The biggest share (22%) of the delay picked up at Paddock Wood in the four weeks to 9 December 2023 came from faulty trains.
61% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 127 | 15% | 16% | 5 a day, more than 2 of the other 4 years | - |
| Weather and structures | 7 | <1% | 7% | 0 a day, the most in 5 years | - |
| Autumn | 56 | 7% | 7% | 2 a day, more than 1 of the other 4 years | - |
| External | 43 | 5% | 4% | 2 a day, the most in 5 years | - |
| Network management | 111 | 14% | 17% | 4 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 181 | 22% | 16% | 6 a day, the most in 5 years | 5 |
| Traincrew | 86 | 10% | 11% | 3 a day, the most in 5 years | 7 |
| Stations | 20 | 2% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 55 | 7% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 135 | 16% | 7% | 5 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 89 |
| TG | Driver | 71 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 62 |
| Q3 | NZ Pumps T | 56 |
| TT | Leaf fall Neutral | 47 |
| MT | Confirmed train borne safety system faults (not cab based) | 45 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 39 |
| I9 | Fires starting on Network Rail Infrastructure | 33 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 33 |
| FW | Late start/yard overtime not explained by Operator | 28 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 1,984 |
| TG | Driver | 1,601 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,562 |
| IB | Points failure (including no fault found) | 1,230 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,216 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 941 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 927 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 893 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 875 |
| TT | Leaf fall Neutral | 764 |