59 delay minutes

The biggest share (34%) of the delay picked up at Purfleet in the four weeks to 9 December 2023 came from signal, points and power faults.

58% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track610%8%-
Signals, points and power2034%16%-
Weather and structures--7%-
Autumn35%7%-
External--4%-
Network management712%17%-
The operators' causes
Train faults47%16%-
Traincrew814%11%-
Stations23%3%-
Operations23%5%-
Operator, other712%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure13
ACWaiting Train preparation or completion of TOPS list/RT39737
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles4
MUDepot operating problem4
TWDriver adhering to company professional driving standards or policy4
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4
J0Telecom equipment radio failure (GSM-R)3
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)3
QHAdhesion problems due to leaf contamination3
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.584
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail247
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)247
JATSR speed restrictions for track work outside of the Timetable Planning Rules223
TGDriver209
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles195
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure190
XLFire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents)167
VHPassenger Communication cord, door egress or emergency train alarm operated163
TWDriver adhering to company professional driving standards or policy160