59 delay minutes
The biggest share (34%) of the delay picked up at Purfleet in the four weeks to 9 December 2023 came from signal, points and power faults.
58% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 6 | 10% | 8% | - |
| Signals, points and power | 20 | 34% | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | 3 | 5% | 7% | - |
| External | - | - | 4% | - |
| Network management | 7 | 12% | 17% | - |
| The operators' causes | ||||
| Train faults | 4 | 7% | 16% | - |
| Traincrew | 8 | 14% | 11% | - |
| Stations | 2 | 3% | 3% | - |
| Operations | 2 | 3% | 5% | - |
| Operator, other | 7 | 12% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 13 |
| AC | Waiting Train preparation or completion of TOPS list/RT3973 | 7 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 4 |
| MU | Depot operating problem | 4 |
| TW | Driver adhering to company professional driving standards or policy | 4 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 4 |
| J0 | Telecom equipment radio failure (GSM-R) | 3 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 3 |
| QH | Adhesion problems due to leaf contamination | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 584 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 247 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 247 |
| JA | TSR speed restrictions for track work outside of the Timetable Planning Rules | 223 |
| TG | Driver | 209 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 195 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 190 |
| XL | Fire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents) | 167 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 163 |
| TW | Driver adhering to company professional driving standards or policy | 160 |