Pinhoe
1,285 delay minutes
The biggest share (26%) of the delay picked up at Pinhoe in the four weeks to 9 December 2023 came from how the network was run.
75% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 88 | 7% | 8% | 3 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 132 | 10% | 16% | 5 a day, the least in 5 years | - |
| Weather and structures | 116 | 9% | 7% | 4 a day, more than 3 of the other 4 years | - |
| Autumn | 201 | 16% | 7% | 7 a day, the least in 5 years | - |
| External | 70 | 5% | 4% | 3 a day, more than 2 of the other 4 years | - |
| Network management | 328 | 26% | 17% | 12 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 62 | 5% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Traincrew | 78 | 6% | 11% | 3 a day, more than 2 of the other 4 years | - |
| Stations | 27 | 2% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 3 | <1% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 180 | 14% | 7% | 6 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 140 |
| TT | Leaf fall Neutral | 140 |
| OU | Delays not Investigated by Network Rail | 84 |
| IB | Points failure (including no fault found) | 82 |
| JK | Flooding not due to exceptional weather | 81 |
| TG | Driver | 52 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 51 |
| ON | Delays not properly investigated by Network Rail | 50 |
| QH | Adhesion problems due to leaf contamination | 49 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 36 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2,788 |
| MD | Technical failures below the solebar | 2,685 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,443 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,165 |
| T2 | Delay at unstaffed station to non-DOO train | 1,812 |
| TG | Driver | 1,708 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,590 |
| IC | Track circuit failure (including no fault found) | 1,553 |
| TT | Leaf fall Neutral | 1,457 |
| IB | Points failure (including no fault found) | 1,406 |