1,285 delay minutes

The biggest share (26%) of the delay picked up at Pinhoe in the four weeks to 9 December 2023 came from how the network was run.

75% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track887%8% 3 a day, more than 2 of the other 4 years-
Signals, points and power13210%16% 5 a day, the least in 5 years-
Weather and structures1169%7% 4 a day, more than 3 of the other 4 years-
Autumn20116%7% 7 a day, the least in 5 years-
External705%4% 3 a day, more than 2 of the other 4 years-
Network management32826%17% 12 a day, more than 2 of the other 4 years-
The operators' causes
Train faults625%16% 2 a day, more than 2 of the other 4 years-
Traincrew786%11% 3 a day, more than 2 of the other 4 years-
Stations272%3% 1 a day, more than 1 of the other 4 years-
Operations3<1%5% 0 a day, more than 2 of the other 4 years-
Operator, other18014%7% 6 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T140
TTLeaf fall Neutral140
OUDelays not Investigated by Network Rail84
IBPoints failure (including no fault found)82
JKFlooding not due to exceptional weather81
TGDriver52
IRBroken/cracked/twisted/buckled/flawed rail51
ONDelays not properly investigated by Network Rail50
QHAdhesion problems due to leaf contamination49
I8Animal Strike or Incursion within the control of Network Rail36
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)2,788
MDTechnical failures below the solebar2,685
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,443
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,165
T2Delay at unstaffed station to non-DOO train1,812
TGDriver1,708
OCSignaller including mis-routing (not ERTM /ETCS related)1,590
ICTrack circuit failure (including no fault found)1,553
TTLeaf fall Neutral1,457
IBPoints failure (including no fault found)1,406