Leaves on the Line

Plumstead

PLU Kent route
CSV JSON

578 delay minutes

The biggest share (28%) of the delay picked up at Plumstead in the four weeks to 9 December 2023 came from other operator causes.

65% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track326%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power5810%16% 2 a day, more than 1 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn9416%7% 3 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management10318%17% 4 a day, the least in 5 years-
The operators' causes
Train faults6311%16% 2 a day, the least in 5 years-
Traincrew356%11% 1 a day, the least in 5 years-
Stations264%3% 1 a day, more than 2 of the other 4 years-
Operations5<1%5% 0 a day, the least in 5 years-
Operator, other16328%7% 6 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T90
TTLeaf fall Neutral87
VHPassenger Communication cord, door egress or emergency train alarm operated52
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.32
ICTrack circuit failure (including no fault found)29
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)28
TGDriver27
MNBrake and brake systems faults; including wheel flats where no other cause had been identified18
OCSignaller including mis-routing (not ERTM /ETCS related)17
M8Technical failures above the Solebar16
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)6,268
VHPassenger Communication cord, door egress or emergency train alarm operated5,376
TGDriver4,497
ICTrack circuit failure (including no fault found)2,912
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,366
M8Technical failures above the Solebar1,777
IBPoints failure (including no fault found)1,628
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,398
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,379
M7Door and Door system faults1,257