Plumstead
578 delay minutes
The biggest share (28%) of the delay picked up at Plumstead in the four weeks to 9 December 2023 came from other operator causes.
65% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 32 | 6% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 58 | 10% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 94 | 16% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 103 | 18% | 17% | 4 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 63 | 11% | 16% | 2 a day, the least in 5 years | - |
| Traincrew | 35 | 6% | 11% | 1 a day, the least in 5 years | - |
| Stations | 26 | 4% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 5 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 163 | 28% | 7% | 6 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 90 |
| TT | Leaf fall Neutral | 87 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 52 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 32 |
| IC | Track circuit failure (including no fault found) | 29 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 28 |
| TG | Driver | 27 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 18 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 17 |
| M8 | Technical failures above the Solebar | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 6,268 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 5,376 |
| TG | Driver | 4,497 |
| IC | Track circuit failure (including no fault found) | 2,912 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,366 |
| M8 | Technical failures above the Solebar | 1,777 |
| IB | Points failure (including no fault found) | 1,628 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,398 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,379 |
| M7 | Door and Door system faults | 1,257 |