Plymouth
1,956 delay minutes
The biggest share (22%) of the delay picked up at Plymouth in the four weeks to 9 December 2023 came from track faults.
57% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 434 | 22% | 8% | 16 a day, the most in 5 years | 4 |
| Signals, points and power | 125 | 6% | 16% | 4 a day, the least in 5 years | - |
| Weather and structures | 284 | 15% | 7% | 10 a day, the most in 5 years | 13 |
| Autumn | 76 | 4% | 7% | 3 a day, more than 2 of the other 4 years | - |
| External | 57 | 3% | 4% | 2 a day, more than 2 of the other 4 years | - |
| Network management | 219 | 11% | 17% | 8 a day, more than 3 of the other 4 years | 85 |
| The operators' causes | |||||
| Train faults | 342 | 17% | 16% | 12 a day, the least in 5 years | 7 |
| Traincrew | 269 | 14% | 11% | 10 a day, more than 3 of the other 4 years | 45 |
| Stations | 31 | 2% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 50 | 3% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 69 | 4% | 7% | 2 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 338 |
| TG | Driver | 220 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 145 |
| OU | Delays not Investigated by Network Rail | 124 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 91 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 86 |
| JK | Flooding not due to exceptional weather | 81 |
| M8 | Technical failures above the Solebar | 79 |
| Q3 | NZ Pumps T | 52 |
| TT | Leaf fall Neutral | 50 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 13,273 |
| MD | Technical failures below the solebar | 7,170 |
| M8 | Technical failures above the Solebar | 5,237 |
| IB | Points failure (including no fault found) | 4,414 |
| MU | Depot operating problem | 4,089 |
| IC | Track circuit failure (including no fault found) | 3,464 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,366 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 3,232 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,024 |
| M7 | Door and Door system faults | 2,841 |