1,801 delay minutes
The biggest share (26%) of the delay picked up at Portsmouth Harbour in the four weeks to 9 December 2023 came from signal, points and power faults.
82% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 190 | 11% | 8% | 7 a day, the most in 5 years | - |
| Signals, points and power | 475 | 26% | 16% | 17 a day, more than 2 of the other 4 years | 3 |
| Weather and structures | 13 | <1% | 7% | 0 a day, the least in 5 years | 1 |
| Autumn | 20 | 1% | 7% | 1 a day, the least in 5 years | 5 |
| External | 14 | <1% | 4% | 1 a day, the least in 5 years | - |
| Network management | 306 | 17% | 17% | 11 a day, more than 2 of the other 4 years | 13 |
| The operators' causes | |||||
| Train faults | 388 | 22% | 16% | 14 a day, more than 3 of the other 4 years | 8 |
| Traincrew | 254 | 14% | 11% | 9 a day, the most in 5 years | 26 |
| Stations | 48 | 3% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 57 | 3% | 5% | 2 a day, the most in 5 years | 2 |
| Operator, other | 37 | 2% | 7% | 1 a day, more than 1 of the other 4 years | 5 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 277 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 108 |
| I5 | Possession over-run from planned work | 103 |
| TG | Driver | 102 |
| TH | (Senior) Conductor/Train Manager | 96 |
| MU | Depot operating problem | 93 |
| M8 | Technical failures above the Solebar | 73 |
| MY | Coupler, Coupler system and Jumper cable faults | 62 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 60 |
| TI | Traincrew rostering problem | 56 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 5,651 |
| II | Signalling lineside cable fault | 4,695 |
| IB | Points failure (including no fault found) | 3,545 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,453 |
| MD | Technical failures below the solebar | 3,435 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,190 |
| IC | Track circuit failure (including no fault found) | 3,008 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 2,707 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,265 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 2,245 |