Peckham Rye
1,123 delay minutes
The biggest share (34%) of the delay picked up at Peckham Rye in the four weeks to 9 December 2023 came from how the network was run.
76% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 43 | 4% | 8% | 2 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 163 | 15% | 16% | 6 a day, more than 2 of the other 4 years | - |
| Weather and structures | 9 | <1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 27 | 2% | 7% | 1 a day, the most in 5 years | - |
| External | 26 | 2% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 381 | 34% | 17% | 14 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 120 | 11% | 16% | 4 a day, more than 2 of the other 4 years | - |
| Traincrew | 172 | 15% | 11% | 6 a day, more than 2 of the other 4 years | - |
| Stations | 25 | 2% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 42 | 4% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 115 | 10% | 7% | 4 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 142 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 140 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 65 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 62 |
| OB | Delayed by signaller not applying applicable regulating policy | 52 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 44 |
| IB | Points failure (including no fault found) | 34 |
| I5 | Possession over-run from planned work | 31 |
| M8 | Technical failures above the Solebar | 29 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 28 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 6,995 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 6,835 |
| IC | Track circuit failure (including no fault found) | 3,988 |
| OB | Delayed by signaller not applying applicable regulating policy | 3,408 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,846 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 2,735 |
| M8 | Technical failures above the Solebar | 2,392 |
| IB | Points failure (including no fault found) | 2,114 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,621 |
| XP | BRIDGE HIT | 1,615 |