Leaves on the Line

Peckham Rye

PMR Kent route
CSV JSON

1,123 delay minutes

The biggest share (34%) of the delay picked up at Peckham Rye in the four weeks to 9 December 2023 came from how the network was run.

76% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track434%8% 2 a day, more than 1 of the other 4 years-
Signals, points and power16315%16% 6 a day, more than 2 of the other 4 years-
Weather and structures9<1%7% 0 a day, more than 2 of the other 4 years-
Autumn272%7% 1 a day, the most in 5 years-
External262%4% 1 a day, more than 2 of the other 4 years-
Network management38134%17% 14 a day, more than 2 of the other 4 years-
The operators' causes
Train faults12011%16% 4 a day, more than 2 of the other 4 years-
Traincrew17215%11% 6 a day, more than 2 of the other 4 years-
Stations252%3% 1 a day, more than 1 of the other 4 years-
Operations424%5% 2 a day, the most in 5 years-
Operator, other11510%7% 4 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver142
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)140
MPRail / wheel interface, adhesion problems (including ice on the running rail)65
OCSignaller including mis-routing (not ERTM /ETCS related)62
OBDelayed by signaller not applying applicable regulating policy52
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure44
IBPoints failure (including no fault found)34
I5Possession over-run from planned work31
M8Technical failures above the Solebar29
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)28
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver6,995
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)6,835
ICTrack circuit failure (including no fault found)3,988
OBDelayed by signaller not applying applicable regulating policy3,408
OCSignaller including mis-routing (not ERTM /ETCS related)2,846
VHPassenger Communication cord, door egress or emergency train alarm operated2,735
M8Technical failures above the Solebar2,392
IBPoints failure (including no fault found)2,114
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,621
XPBRIDGE HIT1,615