Penrith North Lakes
1,493 delay minutes
The biggest share (40%) of the delay picked up at Penrith North Lakes in the four weeks to 9 December 2023 came from faulty trains.
33% of these minutes were knock-on from something that happened elsewhere first. 73% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 18 | 1% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 142 | 10% | 16% | 5 a day, more than 2 of the other 4 years | - |
| Weather and structures | 510 | 34% | 7% | 18 a day, the most in 5 years | - |
| Autumn | 16 | 1% | 7% | 1 a day, the most in 5 years | - |
| External | 10 | <1% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 58 | 4% | 17% | 2 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 598 | 40% | 16% | 21 a day, the most in 5 years | - |
| Traincrew | 52 | 3% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | 19 | 1% | 3% | 1 a day, the most in 5 years | - |
| Operations | 32 | 2% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 40 | 3% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 371 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 294 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 153 |
| IB | Points failure (including no fault found) | 101 |
| MB | Electic Loco failure, defect, attention | 76 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 63 |
| M7 | Door and Door system faults | 45 |
| TG | Driver | 40 |
| MD | Technical failures below the solebar | 28 |
| IA | Signal failure (including no fault found) | 25 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 4,666 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 2,301 |
| I1 | Overhead line/third rail defect | 2,150 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,389 |
| IC | Track circuit failure (including no fault found) | 1,260 |
| MD | Technical failures below the solebar | 1,208 |
| MB | Electic Loco failure, defect, attention | 1,177 |
| TG | Driver | 1,054 |
| M8 | Technical failures above the Solebar | 1,037 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 1,020 |