Leaves on the Line

Penrith North Lakes

PNR North West route
CSV JSON

1,493 delay minutes

The biggest share (40%) of the delay picked up at Penrith North Lakes in the four weeks to 9 December 2023 came from faulty trains.

33% of these minutes were knock-on from something that happened elsewhere first. 73% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track181%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power14210%16% 5 a day, more than 2 of the other 4 years-
Weather and structures51034%7% 18 a day, the most in 5 years-
Autumn161%7% 1 a day, the most in 5 years-
External10<1%4% 0 a day, more than 2 of the other 4 years-
Network management584%17% 2 a day, more than 2 of the other 4 years-
The operators' causes
Train faults59840%16% 21 a day, the most in 5 years-
Traincrew523%11% 2 a day, more than 3 of the other 4 years-
Stations191%3% 1 a day, the most in 5 years-
Operations322%5% 1 a day, the most in 5 years-
Operator, other403%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)371
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure294
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)153
IBPoints failure (including no fault found)101
MBElectic Loco failure, defect, attention76
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail63
M7Door and Door system faults45
TGDriver40
MDTechnical failures below the solebar28
IASignal failure (including no fault found)25
Since 2018
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail4,666
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions2,301
I1Overhead line/third rail defect2,150
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,389
ICTrack circuit failure (including no fault found)1,260
MDTechnical failures below the solebar1,208
MBElectic Loco failure, defect, attention1,177
TGDriver1,054
M8Technical failures above the Solebar1,037
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)1,020