Penistone
344 delay minutes
The biggest share (23%) of the delay picked up at Penistone in the four weeks to 9 December 2023 came from signal, points and power faults.
81% of these minutes were knock-on from something that happened elsewhere first. 78% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 17 | 5% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 79 | 23% | 16% | 3 a day, more than 1 of the other 4 years | 1 |
| Weather and structures | 21 | 6% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 34 | 10% | 7% | 1 a day, the least in 5 years | - |
| External | 7 | 2% | 4% | 0 a day, the least in 5 years | - |
| Network management | 26 | 7% | 17% | 1 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 27 | 8% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Traincrew | 55 | 16% | 11% | 2 a day, more than 2 of the other 4 years | - |
| Stations | 3 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 29 | 8% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 47 | 14% | 7% | 2 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IH | Power Supply And Distribution System Failure | 38 |
| TG | Driver | 36 |
| Q3 | NZ Pumps T | 34 |
| TT | Leaf fall Neutral | 34 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 31 |
| MD | Technical failures below the solebar | 27 |
| OU | Delays not Investigated by Network Rail | 22 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 21 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 17 |
| T8 | Delays at Station believed to be operator cause and Information required from operator (Ops responsibility) | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 1,545 |
| MD | Technical failures below the solebar | 1,409 |
| TG | Driver | 1,221 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 1,060 |
| Q3 | NZ Pumps T | 882 |
| TT | Leaf fall Neutral | 687 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 658 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 643 |
| XP | BRIDGE HIT | 633 |
| TH | (Senior) Conductor/Train Manager | 607 |