Leaves on the Line

Penzance

PNZ Western route
CSV JSON

956 delay minutes

The biggest share (22%) of the delay picked up at Penzance in the four weeks to 9 December 2023 came from track faults.

75% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track21522%8% 8 a day, the most in 5 years3
Signals, points and power18119%16% 6 a day, more than 2 of the other 4 years-
Weather and structures768%7% 3 a day, more than 2 of the other 4 years3
Autumn344%7% 1 a day, more than 1 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management15516%17% 6 a day, the most in 5 years26
The operators' causes
Train faults717%16% 3 a day, more than 2 of the other 4 years3
Traincrew15817%11% 6 a day, the most in 5 years18
Stations101%3% 0 a day, more than 3 of the other 4 years-
Operations303%5% 1 a day, the most in 5 years1
Operator, other263%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver149
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.137
ICTrack circuit failure (including no fault found)92
OUDelays not Investigated by Network Rail92
IRBroken/cracked/twisted/buckled/flawed rail78
J3Axle Counter Failure42
JKFlooding not due to exceptional weather42
MUDepot operating problem40
I5Possession over-run from planned work33
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure31
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver6,228
MDTechnical failures below the solebar4,384
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,426
M8Technical failures above the Solebar2,175
IBPoints failure (including no fault found)2,171
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail2,002
M7Door and Door system faults1,625
IASignal failure (including no fault found)1,624
MUDepot operating problem1,598
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,434