Poppleton
498 delay minutes
The biggest share (32%) of the delay picked up at Poppleton in the four weeks to 9 December 2023 came from how the network was run.
67% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 15 | 3% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 71 | 14% | 16% | 3 a day, the most in 5 years | - |
| Weather and structures | 21 | 4% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 58 | 12% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 13 | 3% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 159 | 32% | 17% | 6 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 21 | 4% | 16% | 1 a day, the least in 5 years | - |
| Traincrew | 62 | 12% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | 8 | 2% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 13 | 3% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 57 | 11% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 79 |
| Q3 | NZ Pumps T | 53 |
| TG | Driver | 50 |
| TT | Leaf fall Neutral | 48 |
| IA | Signal failure (including no fault found) | 38 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 31 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 27 |
| II | Signalling lineside cable fault | 14 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 13 |
| TH | (Senior) Conductor/Train Manager | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,112 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 830 |
| MD | Technical failures below the solebar | 705 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 555 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 555 |
| IA | Signal failure (including no fault found) | 510 |
| OU | Delays not Investigated by Network Rail | 474 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 468 |
| Q3 | NZ Pumps T | 466 |
| IB | Points failure (including no fault found) | 422 |