Leaves on the Line

Poppleton

POP North & East route
CSV JSON

498 delay minutes

The biggest share (32%) of the delay picked up at Poppleton in the four weeks to 9 December 2023 came from how the network was run.

67% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track153%8% 1 a day, more than 3 of the other 4 years-
Signals, points and power7114%16% 3 a day, the most in 5 years-
Weather and structures214%7% 1 a day, the most in 5 years-
Autumn5812%7% 2 a day, more than 3 of the other 4 years-
External133%4% 0 a day, more than 3 of the other 4 years-
Network management15932%17% 6 a day, more than 3 of the other 4 years-
The operators' causes
Train faults214%16% 1 a day, the least in 5 years-
Traincrew6212%11% 2 a day, more than 3 of the other 4 years-
Stations82%3% 0 a day, more than 2 of the other 4 years-
Operations133%5% 0 a day, more than 3 of the other 4 years-
Operator, other5711%7% 2 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OUDelays not Investigated by Network Rail79
Q3NZ Pumps T53
TGDriver50
TTLeaf fall Neutral48
IASignal failure (including no fault found)38
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)31
OCSignaller including mis-routing (not ERTM /ETCS related)27
IISignalling lineside cable fault14
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure13
TH(Senior) Conductor/Train Manager12
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,112
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)830
MDTechnical failures below the solebar705
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure555
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)555
IASignal failure (including no fault found)510
OUDelays not Investigated by Network Rail474
OCSignaller including mis-routing (not ERTM /ETCS related)468
Q3NZ Pumps T466
IBPoints failure (including no fault found)422