Porth
0 delay minutes
No delay was picked up at Porth in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | - | - | 17% | 0 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | - |
| Traincrew | - | - | 11% | 0 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IL | Token equipment failure (including no fault found) | 1,121 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 862 |
| TG | Driver | 815 |
| T2 | Delay at unstaffed station to non-DOO train | 800 |
| TH | (Senior) Conductor/Train Manager | 787 |
| OU | Delays not Investigated by Network Rail | 702 |
| MD | Technical failures below the solebar | 640 |
| M8 | Technical failures above the Solebar | 508 |
| IB | Points failure (including no fault found) | 506 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 497 |