Pontypridd
148 delay minutes
The biggest share (34%) of the delay picked up at Pontypridd in the four weeks to 9 December 2023 came from faulty trains.
45% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | 1 |
| Signals, points and power | 12 | 8% | 16% | 0 a day, more than 3 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 12 | 8% | 17% | 0 a day, the least in 5 years | 6 |
| The operators' causes | |||||
| Train faults | 51 | 34% | 16% | 2 a day, more than 3 of the other 4 years | 17 |
| Traincrew | 44 | 30% | 11% | 2 a day, more than 2 of the other 4 years | 1 |
| Stations | 2 | 1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 27 | 18% | 5% | 1 a day, more than 3 of the other 4 years | 1 |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 37 |
| TZ | Other Passenger Train Operating Company causes | 24 |
| MD | Technical failures below the solebar | 23 |
| MU | Depot operating problem | 11 |
| MT | Confirmed train borne safety system faults (not cab based) | 10 |
| IJ | AWS/ATP/TPWS/Train stop/On track equipment failure | 9 |
| OB | Delayed by signaller not applying applicable regulating policy | 7 |
| TI | Traincrew rostering problem | 7 |
| M9 | Reported fleet equipment defect - no fault found | 4 |
| IB | Points failure (including no fault found) | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 4,088 |
| TG | Driver | 1,695 |
| TH | (Senior) Conductor/Train Manager | 814 |
| T3 | Waiting connections from other transport modes | 799 |
| TZ | Other Passenger Train Operating Company causes | 722 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 708 |
| IL | Token equipment failure (including no fault found) | 632 |
| TA | Train-crew/loco/stock/unit diagram issues | 628 |
| M8 | Technical failures above the Solebar | 625 |
| T2 | Delay at unstaffed station to non-DOO train | 615 |