Prudhoe
573 delay minutes
The biggest share (21%) of the delay picked up at Prudhoe in the four weeks to 9 December 2023 came from autumn leaves.
38% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 36 | 6% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Weather and structures | 53 | 9% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 122 | 21% | 7% | 4 a day, more than 1 of the other 4 years | - |
| External | 16 | 3% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 63 | 11% | 17% | 2 a day, more than 3 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 117 | 20% | 16% | 4 a day, the most in 5 years | 1 |
| Traincrew | 34 | 6% | 11% | 1 a day, more than 3 of the other 4 years | 1 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 28 | 5% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 104 | 18% | 7% | 4 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 99 |
| TT | Leaf fall Neutral | 94 |
| MW | Weather - effect on T&RS equipment | 74 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 53 |
| OU | Delays not Investigated by Network Rail | 37 |
| QI | Cautioning due to railhead leaf contamination | 23 |
| TG | Driver | 23 |
| IB | Points failure (including no fault found) | 19 |
| J0 | Telecom equipment radio failure (GSM-R) | 17 |
| TZ | Other Passenger Train Operating Company causes | 15 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 1,322 |
| TT | Leaf fall Neutral | 1,185 |
| MD | Technical failures below the solebar | 1,123 |
| II | Signalling lineside cable fault | 984 |
| TG | Driver | 713 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 697 |
| RB | Passengers joining/alighting | 653 |
| IA | Signal failure (including no fault found) | 562 |
| IC | Track circuit failure (including no fault found) | 542 |
| QJ | Special working for leaf-fall track circuit operation | 361 |