Perry Barr
54 delay minutes
Most of the delay picked up at Perry Barr in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | 54 | 100% | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 54 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 54 |
| TG | Driver | 28 |
| I1 | Overhead line/third rail defect | 21 |
| IC | Track circuit failure (including no fault found) | 21 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 18 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 18 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 16 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 16 |
| MD | Technical failures below the solebar | 15 |
| AK | Safety Ins and mishaps(derailments, fire, chemical spill) in off n/w freight yard or terminal (inc private sdgs affecting FOC | 14 |