Leaves on the Line

Pitsea

PSE Anglia route
CSV JSON

256 delay minutes

The biggest share (29%) of the delay picked up at Pitsea in the four weeks to 9 December 2023 came from other operator causes.

46% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2510%8% 1 a day, more than 3 of the other 4 years-
Signals, points and power5622%16% 2 a day, more than 1 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn1<1%7% 0 a day, more than 1 of the other 4 years-
External177%4% 1 a day, more than 2 of the other 4 years-
Network management249%17% 1 a day, more than 1 of the other 4 years4
The operators' causes
Train faults94%16% 0 a day, more than 2 of the other 4 years-
Traincrew2711%11% 1 a day, the most in 5 years3
Stations218%3% 1 a day, the most in 5 years-
Operations31%5% 0 a day, more than 1 of the other 4 years-
Operator, other7429%7% 3 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
VHPassenger Communication cord, door egress or emergency train alarm operated73
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles44
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.25
RBPassengers joining/alighting20
TWDriver adhering to company professional driving standards or policy15
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)13
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)12
J0Telecom equipment radio failure (GSM-R)10
M8Technical failures above the Solebar9
TGDriver9
Since 2018
CodeWhat Network Rail loggedMinutes
J8OTM DAMAGE3,028
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)2,187
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,047
TGDriver736
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)668
TWDriver adhering to company professional driving standards or policy600
VHPassenger Communication cord, door egress or emergency train alarm operated556
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles532
X8Animal Strike or incursion not within the control of Network Rail479
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure469