Petersfield
1,615 delay minutes
The biggest share (21%) of the delay picked up at Petersfield in the four weeks to 9 December 2023 came from signal, points and power faults.
67% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 53 | 3% | 8% | 2 a day, the most in 5 years | - |
| Signals, points and power | 336 | 21% | 16% | 12 a day, more than 3 of the other 4 years | - |
| Weather and structures | 9 | <1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 253 | 16% | 7% | 9 a day, more than 3 of the other 4 years | - |
| External | 42 | 3% | 4% | 2 a day, the most in 5 years | - |
| Network management | 192 | 12% | 17% | 7 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 309 | 19% | 16% | 11 a day, the most in 5 years | 1 |
| Traincrew | 73 | 5% | 11% | 3 a day, more than 1 of the other 4 years | - |
| Stations | 55 | 3% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 35 | 2% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 259 | 16% | 7% | 9 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 230 |
| TT | Leaf fall Neutral | 230 |
| MC | Diesel Loco failure, defect, attention | 183 |
| II | Signalling lineside cable fault | 176 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 61 |
| IB | Points failure (including no fault found) | 54 |
| TG | Driver | 51 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 46 |
| MY | Coupler, Coupler system and Jumper cable faults | 41 |
| I5 | Possession over-run from planned work | 40 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| II | Signalling lineside cable fault | 11,737 |
| IC | Track circuit failure (including no fault found) | 9,883 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,845 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,890 |
| I4 | OHLE/third rail power supply failure or reduction | 3,262 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,802 |
| TG | Driver | 2,017 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,850 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 1,803 |
| MD | Technical failures below the solebar | 1,546 |