Patchway
403 delay minutes
The biggest share (27%) of the delay picked up at Patchway in the four weeks to 9 December 2023 came from faulty trains.
59% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 12 | 3% | 8% | 0 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 71 | 18% | 16% | 3 a day, the most in 5 years | - |
| Weather and structures | 34 | 8% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 10 | 2% | 7% | 0 a day, the most in 5 years | - |
| External | 18 | 4% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 69 | 17% | 17% | 2 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 108 | 27% | 16% | 4 a day, the most in 5 years | - |
| Traincrew | 29 | 7% | 11% | 1 a day, the most in 5 years | - |
| Stations | 13 | 3% | 3% | 0 a day, the most in 5 years | - |
| Operations | 12 | 3% | 5% | 0 a day, the most in 5 years | - |
| Operator, other | 27 | 7% | 7% | 1 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M9 | Reported fleet equipment defect - no fault found | 58 |
| IB | Points failure (including no fault found) | 50 |
| OU | Delays not Investigated by Network Rail | 34 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 23 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 21 |
| XP | BRIDGE HIT | 18 |
| TG | Driver | 16 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 14 |
| QM | Train schedule/STP Process including erroneous simplifiers | 12 |
| IA | Signal failure (including no fault found) | 11 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 1,019 |
| J3 | Axle Counter Failure | 913 |
| MD | Technical failures below the solebar | 717 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 712 |
| TG | Driver | 515 |
| I1 | Overhead line/third rail defect | 483 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 452 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 410 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 398 |
| M8 | Technical failures above the Solebar | 389 |