Leaves on the Line

Queenborough

QBR Kent route
CSV JSON

0 delay minutes

No delay was picked up at Queenborough in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
XBVandalism or theft (including the placing of objects on the line)46
IKTelecom equipment failure (including no fault found)26
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)24
VWSevere weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions22
TGDriver17
MDTechnical failures below the solebar13
IASignal failure (including no fault found)11
I1Overhead line/third rail defect11
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail11
Q3NZ Pumps T10