Queens Park (London)
567 delay minutes
The biggest share (37%) of the delay picked up at Queens Park (London) in the four weeks to 9 December 2023 came from signal, points and power faults.
41% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 66 | 12% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 212 | 37% | 16% | 8 a day, more than 3 of the other 4 years | - |
| Weather and structures | 21 | 4% | 7% | 1 a day, the most in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 3 | <1% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 50 | 9% | 17% | 2 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 43 | 8% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Traincrew | 12 | 2% | 11% | 0 a day, the least in 5 years | - |
| Stations | 6 | 1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 153 | 27% | 5% | 5 a day, more than 1 of the other 4 years | - |
| Operator, other | 1 | <1% | 7% | 0 a day, the least in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 170 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 140 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 25 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 21 |
| JK | Flooding not due to exceptional weather | 21 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 20 |
| MU | Depot operating problem | 19 |
| IA | Signal failure (including no fault found) | 17 |
| M8 | Technical failures above the Solebar | 15 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 13 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 7,787 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 6,286 |
| TG | Driver | 2,169 |
| IB | Points failure (including no fault found) | 1,770 |
| IA | Signal failure (including no fault found) | 1,721 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,482 |
| IC | Track circuit failure (including no fault found) | 1,316 |
| MD | Technical failures below the solebar | 823 |
| I1 | Overhead line/third rail defect | 689 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 631 |