588 delay minutes

The biggest share (29%) of the delay picked up at Rainham (Kent) in the four weeks to 9 December 2023 came from how the network was run.

96% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track122%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power6711%16% 2 a day, more than 2 of the other 4 years-
Weather and structures102%7% 0 a day, more than 2 of the other 4 years-
Autumn9216%7% 3 a day, the most in 5 years-
External275%4% 1 a day, more than 2 of the other 4 years1
Network management17329%17% 6 a day, the most in 5 years-
The operators' causes
Train faults397%16% 1 a day, more than 2 of the other 4 years-
Traincrew366%11% 1 a day, more than 2 of the other 4 years4
Stations71%3% 0 a day, more than 1 of the other 4 years-
Operations5<1%5% 0 a day, more than 3 of the other 4 years-
Operator, other12020%7% 4 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T87
TTLeaf fall Neutral83
ICTrack circuit failure (including no fault found)55
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)53
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)31
OCSignaller including mis-routing (not ERTM /ETCS related)26
TGDriver23
XBVandalism or theft (including the placing of objects on the line)23
IQTrackside sign blown down, fallen over, missing, defective, mis-placed17
FWLate start/yard overtime not explained by Operator15
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,673
TGDriver1,927
IBPoints failure (including no fault found)1,265
M8Technical failures above the Solebar1,052
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.851
JBReactionary Delay to 'P' coded TSRs797
ICTrack circuit failure (including no fault found)787
VHPassenger Communication cord, door egress or emergency train alarm operated675
OCSignaller including mis-routing (not ERTM /ETCS related)640
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure570