Ramsgate
2,314 delay minutes
The biggest share (20%) of the delay picked up at Ramsgate in the four weeks to 9 December 2023 came from how the network was run.
68% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 17 | <1% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 156 | 7% | 16% | 6 a day, more than 1 of the other 4 years | 2 |
| Weather and structures | 220 | 10% | 7% | 8 a day, the most in 5 years | 2 |
| Autumn | 187 | 8% | 7% | 7 a day, more than 3 of the other 4 years | - |
| External | 1 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 474 | 20% | 17% | 17 a day, more than 3 of the other 4 years | 49 |
| The operators' causes | |||||
| Train faults | 430 | 19% | 16% | 15 a day, more than 3 of the other 4 years | 3 |
| Traincrew | 244 | 11% | 11% | 9 a day, the most in 5 years | 4 |
| Stations | 112 | 5% | 3% | 4 a day, the most in 5 years | - |
| Operations | 178 | 8% | 5% | 6 a day, the most in 5 years | - |
| Operator, other | 295 | 13% | 7% | 11 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OG | Ice on conductor rail/OHLE | 220 |
| Q3 | NZ Pumps T | 187 |
| TT | Leaf fall Neutral | 172 |
| TG | Driver | 161 |
| TZ | Other Passenger Train Operating Company causes | 120 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 116 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 113 |
| M8 | Technical failures above the Solebar | 103 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 81 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 76 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 5,955 |
| TG | Driver | 5,598 |
| TZ | Other Passenger Train Operating Company causes | 3,623 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,142 |
| IB | Points failure (including no fault found) | 3,059 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 2,875 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,857 |
| IC | Track circuit failure (including no fault found) | 2,790 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 2,746 |
| XP | BRIDGE HIT | 2,658 |