Ramsgate

RAM Kent route
CSV JSON

2,314 delay minutes

The biggest share (20%) of the delay picked up at Ramsgate in the four weeks to 9 December 2023 came from how the network was run.

68% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track17<1%8% 1 a day, the least in 5 years-
Signals, points and power1567%16% 6 a day, more than 1 of the other 4 years2
Weather and structures22010%7% 8 a day, the most in 5 years2
Autumn1878%7% 7 a day, more than 3 of the other 4 years-
External1<1%4% 0 a day, the least in 5 years-
Network management47420%17% 17 a day, more than 3 of the other 4 years49
The operators' causes
Train faults43019%16% 15 a day, more than 3 of the other 4 years3
Traincrew24411%11% 9 a day, the most in 5 years4
Stations1125%3% 4 a day, the most in 5 years-
Operations1788%5% 6 a day, the most in 5 years-
Operator, other29513%7% 11 a day, more than 3 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OGIce on conductor rail/OHLE220
Q3NZ Pumps T187
TTLeaf fall Neutral172
TGDriver161
TZOther Passenger Train Operating Company causes120
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)116
MNBrake and brake systems faults; including wheel flats where no other cause had been identified113
M8Technical failures above the Solebar103
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)81
OCSignaller including mis-routing (not ERTM /ETCS related)76
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5,955
TGDriver5,598
TZOther Passenger Train Operating Company causes3,623
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps3,142
IBPoints failure (including no fault found)3,059
M0Confirmed train cab based safety system fault (including GSMR)2,875
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,857
ICTrack circuit failure (including no fault found)2,790
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards2,746
XPBRIDGE HIT2,658