Leaves on the Line

Raynes Park

RAY Wessex route
CSV JSON

3 delay minutes

Most of the delay picked up at Raynes Park in the four weeks to 9 December 2023 came from signal, points and power faults.

100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power3100%16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%1
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)3
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.213
MDTechnical failures below the solebar187
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure175
IBPoints failure (including no fault found)156
MNBrake and brake systems faults; including wheel flats where no other cause had been identified152
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)146
TGDriver101
IRBroken/cracked/twisted/buckled/flawed rail91
M7Door and Door system faults91
TH(Senior) Conductor/Train Manager54