CSV JSON

226 delay minutes

The biggest share (33%) of the delay picked up at Robertsbridge in the four weeks to 9 December 2023 came from autumn leaves.

75% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track3013%8%-
Signals, points and power125%16%-
Weather and structures--7%-
Autumn7633%7%1
External--4%-
Network management6830%17%-
The operators' causes
Train faults2411%16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other177%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QICautioning due to railhead leaf contamination59
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)51
JBReactionary Delay to 'P' coded TSRs30
M0Confirmed train cab based safety system fault (including GSMR)24
Q3NZ Pumps T17
TTLeaf fall Neutral17
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)10
IBPoints failure (including no fault found)7
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive7
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure5
Since 2018
CodeWhat Network Rail loggedMinutes
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail159
I1Overhead line/third rail defect149
IRBroken/cracked/twisted/buckled/flawed rail98
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)96
QNVSTP Schedule/ VSTP Process (TSI created schedule)96
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)91
JKFlooding not due to exceptional weather88
I2AC/DC trip (including no fault or cause found)59
QICautioning due to railhead leaf contamination59
X8Animal Strike or incursion not within the control of Network Rail47