Robertsbridge
226 delay minutes
The biggest share (33%) of the delay picked up at Robertsbridge in the four weeks to 9 December 2023 came from autumn leaves.
75% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 30 | 13% | 8% | - |
| Signals, points and power | 12 | 5% | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | 76 | 33% | 7% | 1 |
| External | - | - | 4% | - |
| Network management | 68 | 30% | 17% | - |
| The operators' causes | ||||
| Train faults | 24 | 11% | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 17 | 7% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QI | Cautioning due to railhead leaf contamination | 59 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 51 |
| JB | Reactionary Delay to 'P' coded TSRs | 30 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 24 |
| Q3 | NZ Pumps T | 17 |
| TT | Leaf fall Neutral | 17 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 10 |
| IB | Points failure (including no fault found) | 7 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 7 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 159 |
| I1 | Overhead line/third rail defect | 149 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 98 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 96 |
| QN | VSTP Schedule/ VSTP Process (TSI created schedule) | 96 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 91 |
| JK | Flooding not due to exceptional weather | 88 |
| I2 | AC/DC trip (including no fault or cause found) | 59 |
| QI | Cautioning due to railhead leaf contamination | 59 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 47 |