713 delay minutes

The biggest share (24%) of the delay picked up at Redcar Central in the four weeks to 9 December 2023 came from signal, points and power faults.

66% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track466%8% 2 a day, more than 1 of the other 4 years1
Signals, points and power16824%16% 6 a day, more than 3 of the other 4 years2
Weather and structures426%7% 2 a day, the most in 5 years2
Autumn365%7% 1 a day, the most in 5 years-
External375%4% 1 a day, more than 2 of the other 4 years-
Network management11716%17% 4 a day, more than 3 of the other 4 years-
The operators' causes
Train faults14220%16% 5 a day, the most in 5 years2
Traincrew193%11% 1 a day, more than 3 of the other 4 years2
Stations304%3% 1 a day, the most in 5 years-
Operations548%5% 2 a day, the most in 5 years-
Operator, other223%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)130
OUDelays not Investigated by Network Rail45
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.35
M8Technical failures above the Solebar34
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail30
MDTechnical failures below the solebar26
MCDiesel Loco failure, defect, attention25
TZOther Passenger Train Operating Company causes25
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)23
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)23
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)1,588
TGDriver1,418
XPBRIDGE HIT1,234
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,092
MDTechnical failures below the solebar1,010
RCre-booked assistance for a person with reduced mobility joining/alighting,901
RBPassengers joining/alighting839
OUDelays not Investigated by Network Rail595
M7Door and Door system faults534
ICTrack circuit failure (including no fault found)507