713 delay minutes
The biggest share (24%) of the delay picked up at Redcar Central in the four weeks to 9 December 2023 came from signal, points and power faults.
66% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 46 | 6% | 8% | 2 a day, more than 1 of the other 4 years | 1 |
| Signals, points and power | 168 | 24% | 16% | 6 a day, more than 3 of the other 4 years | 2 |
| Weather and structures | 42 | 6% | 7% | 2 a day, the most in 5 years | 2 |
| Autumn | 36 | 5% | 7% | 1 a day, the most in 5 years | - |
| External | 37 | 5% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 117 | 16% | 17% | 4 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 142 | 20% | 16% | 5 a day, the most in 5 years | 2 |
| Traincrew | 19 | 3% | 11% | 1 a day, more than 3 of the other 4 years | 2 |
| Stations | 30 | 4% | 3% | 1 a day, the most in 5 years | - |
| Operations | 54 | 8% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 22 | 3% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 130 |
| OU | Delays not Investigated by Network Rail | 45 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 35 |
| M8 | Technical failures above the Solebar | 34 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 30 |
| MD | Technical failures below the solebar | 26 |
| MC | Diesel Loco failure, defect, attention | 25 |
| TZ | Other Passenger Train Operating Company causes | 25 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 23 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 23 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 1,588 |
| TG | Driver | 1,418 |
| XP | BRIDGE HIT | 1,234 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,092 |
| MD | Technical failures below the solebar | 1,010 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 901 |
| RB | Passengers joining/alighting | 839 |
| OU | Delays not Investigated by Network Rail | 595 |
| M7 | Door and Door system faults | 534 |
| IC | Track circuit failure (including no fault found) | 507 |