Rochdale
5,024 delay minutes
The biggest share (18%) of the delay picked up at Rochdale in the four weeks to 9 December 2023 came from autumn leaves.
65% of these minutes were knock-on from something that happened elsewhere first. 76% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 175 | 3% | 8% | 6 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 538 | 11% | 16% | 19 a day, more than 3 of the other 4 years | 2 |
| Weather and structures | 595 | 12% | 7% | 21 a day, the most in 5 years | - |
| Autumn | 899 | 18% | 7% | 32 a day, more than 3 of the other 4 years | 1 |
| External | 297 | 6% | 4% | 11 a day, more than 3 of the other 4 years | 3 |
| Network management | 538 | 11% | 17% | 19 a day, more than 2 of the other 4 years | 4 |
| The operators' causes | |||||
| Train faults | 734 | 15% | 16% | 26 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 303 | 6% | 11% | 11 a day, more than 2 of the other 4 years | 9 |
| Stations | 89 | 2% | 3% | 3 a day, more than 1 of the other 4 years | - |
| Operations | 227 | 5% | 5% | 8 a day, more than 2 of the other 4 years | 5 |
| Operator, other | 631 | 13% | 7% | 23 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 593 |
| TT | Leaf fall Neutral | 589 |
| OU | Delays not Investigated by Network Rail | 290 |
| IH | Power Supply And Distribution System Failure | 262 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 260 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 250 |
| MD | Technical failures below the solebar | 241 |
| TG | Driver | 180 |
| QJ | Special working for leaf-fall track circuit operation | 176 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 152 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 14,247 |
| MD | Technical failures below the solebar | 12,992 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 7,304 |
| Q3 | NZ Pumps T | 6,137 |
| M7 | Door and Door system faults | 5,330 |
| TT | Leaf fall Neutral | 5,279 |
| IC | Track circuit failure (including no fault found) | 5,077 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,670 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 4,167 |
| TH | (Senior) Conductor/Train Manager | 4,157 |