Leaves on the Line

Reading

RDG Western route
CSV JSON

10,530 delay minutes

The biggest share (21%) of the delay picked up at Reading in the four weeks to 9 December 2023 came from track faults.

69% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2,20921%8% 79 a day, more than 3 of the other 4 years119
Signals, points and power1,62715%16% 58 a day, more than 2 of the other 4 years72
Weather and structures5695%7% 20 a day, the most in 5 years6
Autumn1642%7% 6 a day, more than 1 of the other 4 years-
External1982%4% 7 a day, the least in 5 years-
Network management1,65316%17% 59 a day, more than 2 of the other 4 years155
The operators' causes
Train faults1,95919%16% 70 a day, more than 2 of the other 4 years58
Traincrew1,06210%11% 38 a day, more than 3 of the other 4 years40
Stations1682%3% 6 a day, more than 3 of the other 4 years-
Operations3834%5% 14 a day, the most in 5 years3
Operator, other5405%7% 19 a day, more than 3 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,117
TGDriver835
IRBroken/cracked/twisted/buckled/flawed rail749
OUDelays not Investigated by Network Rail600
IBPoints failure (including no fault found)558
I1Overhead line/third rail defect446
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure329
ITRough ride or bumps reported - cause not known or no fault found320
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)272
MCDiesel Loco failure, defect, attention268
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver32,645
IBPoints failure (including no fault found)21,055
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.18,013
J3Axle Counter Failure17,945
MDTechnical failures below the solebar17,460
M8Technical failures above the Solebar16,586
MUDepot operating problem13,863
IRBroken/cracked/twisted/buckled/flawed rail13,705
M7Door and Door system faults12,196
I1Overhead line/third rail defect12,157