Leaves on the Line

Radyr

RDR Cardiff Valleys route
CSV JSON

1,351 delay minutes

The biggest share (31%) of the delay picked up at Radyr in the four weeks to 9 December 2023 came from the operators' own operations.

83% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track977%8% 3 a day, the most in 5 years-
Signals, points and power1159%16% 4 a day, more than 2 of the other 4 years-
Weather and structures9<1%7% 0 a day, more than 2 of the other 4 years-
Autumn--7% 0 a day, the least in 5 years-
External171%4% 1 a day, more than 2 of the other 4 years-
Network management967%17% 3 a day, the least in 5 years-
The operators' causes
Train faults29522%16% 11 a day, the least in 5 years16
Traincrew14211%11% 5 a day, more than 2 of the other 4 years-
Stations14411%3% 5 a day, more than 2 of the other 4 years-
Operations41531%5% 15 a day, the most in 5 years-
Operator, other212%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TZOther Passenger Train Operating Company causes396
T2Delay at unstaffed station to non-DOO train118
IRBroken/cracked/twisted/buckled/flawed rail94
J3Axle Counter Failure91
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps83
MUDepot operating problem54
T3Waiting connections from other transport modes52
TGDriver50
OCSignaller including mis-routing (not ERTM /ETCS related)44
MDTechnical failures below the solebar43
Since 2018
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train5,931
TGDriver4,227
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps4,140
TH(Senior) Conductor/Train Manager3,393
MDTechnical failures below the solebar3,212
J3Axle Counter Failure2,906
M8Technical failures above the Solebar2,803
OUDelays not Investigated by Network Rail2,502
TZOther Passenger Train Operating Company causes2,458
IBPoints failure (including no fault found)1,817