Radyr
1,351 delay minutes
The biggest share (31%) of the delay picked up at Radyr in the four weeks to 9 December 2023 came from the operators' own operations.
83% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 97 | 7% | 8% | 3 a day, the most in 5 years | - |
| Signals, points and power | 115 | 9% | 16% | 4 a day, more than 2 of the other 4 years | - |
| Weather and structures | 9 | <1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 17 | 1% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 96 | 7% | 17% | 3 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 295 | 22% | 16% | 11 a day, the least in 5 years | 16 |
| Traincrew | 142 | 11% | 11% | 5 a day, more than 2 of the other 4 years | - |
| Stations | 144 | 11% | 3% | 5 a day, more than 2 of the other 4 years | - |
| Operations | 415 | 31% | 5% | 15 a day, the most in 5 years | - |
| Operator, other | 21 | 2% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TZ | Other Passenger Train Operating Company causes | 396 |
| T2 | Delay at unstaffed station to non-DOO train | 118 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 94 |
| J3 | Axle Counter Failure | 91 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 83 |
| MU | Depot operating problem | 54 |
| T3 | Waiting connections from other transport modes | 52 |
| TG | Driver | 50 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 44 |
| MD | Technical failures below the solebar | 43 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 5,931 |
| TG | Driver | 4,227 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 4,140 |
| TH | (Senior) Conductor/Train Manager | 3,393 |
| MD | Technical failures below the solebar | 3,212 |
| J3 | Axle Counter Failure | 2,906 |
| M8 | Technical failures above the Solebar | 2,803 |
| OU | Delays not Investigated by Network Rail | 2,502 |
| TZ | Other Passenger Train Operating Company causes | 2,458 |
| IB | Points failure (including no fault found) | 1,817 |