Reedham (Norfolk)
0 delay minutes
No delay was picked up at Reedham (Norfolk) in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | 1 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 390 |
| IA | Signal failure (including no fault found) | 138 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 109 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 99 |
| IC | Track circuit failure (including no fault found) | 95 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 94 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 80 |
| IB | Points failure (including no fault found) | 73 |
| MD | Technical failures below the solebar | 65 |
| JF | Off track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure) | 61 |