763 delay minutes
The biggest share (43%) of the delay picked up at Rock Ferry in the four weeks to 9 December 2023 came from faulty trains.
57% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 32 | 4% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 83 | 11% | 7% | 3 a day, the most in 5 years | - |
| External | 202 | 26% | 4% | 7 a day, the most in 5 years | 2 |
| Network management | 42 | 6% | 17% | 2 a day, the least in 5 years | 24 |
| The operators' causes | |||||
| Train faults | 328 | 43% | 16% | 12 a day, the most in 5 years | 16 |
| Traincrew | 58 | 8% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 16 | 2% | 5% | 1 a day, the least in 5 years | - |
| Operator, other | 2 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I9 | Fires starting on Network Rail Infrastructure | 180 |
| M7 | Door and Door system faults | 164 |
| Q3 | NZ Pumps T | 83 |
| M8 | Technical failures above the Solebar | 66 |
| MD | Technical failures below the solebar | 66 |
| IA | Signal failure (including no fault found) | 32 |
| TH | (Senior) Conductor/Train Manager | 31 |
| ZU | No Cause Identified After investigation by both Parties | 26 |
| TG | Driver | 23 |
| XB | Vandalism or theft (including the placing of objects on the line) | 22 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,422 |
| MD | Technical failures below the solebar | 1,388 |
| TH | (Senior) Conductor/Train Manager | 1,142 |
| IC | Track circuit failure (including no fault found) | 1,107 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,001 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 937 |
| ZU | No Cause Identified After investigation by both Parties | 744 |
| IA | Signal failure (including no fault found) | 700 |
| J3 | Axle Counter Failure | 443 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 437 |