Rugeley Trent Valley
527 delay minutes
The biggest share (23%) of the delay picked up at Rugeley Trent Valley in the four weeks to 9 December 2023 came from autumn leaves.
84% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | <1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 105 | 20% | 16% | 4 a day, more than 3 of the other 4 years | - |
| Weather and structures | 11 | 2% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 122 | 23% | 7% | 4 a day, the most in 5 years | - |
| External | 50 | 9% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 68 | 13% | 17% | 2 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 56 | 11% | 16% | 2 a day, more than 2 of the other 4 years | 2 |
| Traincrew | 35 | 7% | 11% | 1 a day, the least in 5 years | 1 |
| Stations | 31 | 6% | 3% | 1 a day, the least in 5 years | - |
| Operations | 3 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 45 | 8% | 7% | 2 a day, the least in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QI | Cautioning due to railhead leaf contamination | 109 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 60 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 46 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 32 |
| TG | Driver | 32 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 28 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 20 |
| Q3 | NZ Pumps T | 13 |
| M9 | Reported fleet equipment defect - no fault found | 12 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,258 |
| TH | (Senior) Conductor/Train Manager | 1,770 |
| IB | Points failure (including no fault found) | 1,319 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,140 |
| I1 | Overhead line/third rail defect | 1,137 |
| IC | Track circuit failure (including no fault found) | 933 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 732 |
| MD | Technical failures below the solebar | 678 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 639 |
| M8 | Technical failures above the Solebar | 560 |