118 delay minutes

The biggest share (44%) of the delay picked up at Rugeley Town in the four weeks to 9 December 2023 came from signal, points and power faults.

25% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power5244%16%-
Weather and structures43%7%-
Autumn1210%7%-
External--4%-
Network management76%17%-
The operators' causes
Train faults43%16%1
Traincrew2319%11%-
Stations33%3%-
Operations76%5%-
Operator, other65%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure46
TGDriver23
QICautioning due to railhead leaf contamination12
TRTrain Operating Company Directive7
ICTrack circuit failure (including no fault found)6
MPRail / wheel interface, adhesion problems (including ice on the running rail)6
DDTechnical Fleet Holding Code4
Q1Takeback Pumps4
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions4
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards3
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)1,385
MPRail / wheel interface, adhesion problems (including ice on the running rail)178
TGDriver161
RQUn-booked assistance for a person with reduced mobility joining/alighting,149
TH(Senior) Conductor/Train Manager142
X3Lightning Strike - damage to protected systems141
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail91
MNBrake and brake systems faults; including wheel flats where no other cause had been identified86
X8Animal Strike or incursion not within the control of Network Rail85
I6Delays as a result of line blocks / track patrols (including late handback)80