Rhymney
726 delay minutes
The biggest share (39%) of the delay picked up at Rhymney in the four weeks to 9 December 2023 came from signal, points and power faults.
56% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 2 | <1% | 8% | 0 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 285 | 39% | 16% | 10 a day, the most in 5 years | 5 |
| Weather and structures | 16 | 2% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 28 | 4% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 31 | 4% | 17% | 1 a day, more than 1 of the other 4 years | 16 |
| The operators' causes | |||||
| Train faults | 120 | 17% | 16% | 4 a day, more than 2 of the other 4 years | 2 |
| Traincrew | 71 | 10% | 11% | 3 a day, more than 3 of the other 4 years | - |
| Stations | 17 | 2% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 136 | 19% | 5% | 5 a day, the most in 5 years | - |
| Operator, other | 20 | 3% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J3 | Axle Counter Failure | 279 |
| TZ | Other Passenger Train Operating Company causes | 132 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 49 |
| TG | Driver | 44 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 28 |
| TH | (Senior) Conductor/Train Manager | 24 |
| MD | Technical failures below the solebar | 18 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 16 |
| M7 | Door and Door system faults | 15 |
| M8 | Technical failures above the Solebar | 15 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,682 |
| J3 | Axle Counter Failure | 1,461 |
| MD | Technical failures below the solebar | 1,261 |
| M8 | Technical failures above the Solebar | 995 |
| T2 | Delay at unstaffed station to non-DOO train | 900 |
| TH | (Senior) Conductor/Train Manager | 823 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 703 |
| TZ | Other Passenger Train Operating Company causes | 621 |
| IB | Points failure (including no fault found) | 550 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 473 |