Romford
733 delay minutes
The biggest share (30%) of the delay picked up at Romford in the four weeks to 9 December 2023 came from faulty trains.
88% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 10 | 1% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 9 | 1% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 57 | 8% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 15 | 2% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 116 | 16% | 17% | 4 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 223 | 30% | 16% | 8 a day, more than 2 of the other 4 years | 3 |
| Traincrew | 11 | 2% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | 13 | 2% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 163 | 22% | 5% | 6 a day, the most in 5 years | - |
| Operator, other | 117 | 16% | 7% | 4 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 153 |
| M2 | Delay due to ATO / ETCS equipment | 65 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 64 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 57 |
| Q3 | NZ Pumps T | 57 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 46 |
| MD | Technical failures below the solebar | 42 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 23 |
| OU | Delays not Investigated by Network Rail | 23 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 22 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 2,445 |
| MU | Depot operating problem | 2,384 |
| M7 | Door and Door system faults | 2,142 |
| TG | Driver | 1,696 |
| IB | Points failure (including no fault found) | 1,486 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 1,426 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,326 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 1,311 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,268 |
| MD | Technical failures below the solebar | 1,192 |