733 delay minutes

The biggest share (30%) of the delay picked up at Romford in the four weeks to 9 December 2023 came from faulty trains.

88% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track101%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power91%16% 0 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn578%7% 2 a day, more than 3 of the other 4 years-
External152%4% 1 a day, more than 3 of the other 4 years-
Network management11616%17% 4 a day, more than 1 of the other 4 years-
The operators' causes
Train faults22330%16% 8 a day, more than 2 of the other 4 years3
Traincrew112%11% 0 a day, more than 1 of the other 4 years-
Stations132%3% 0 a day, more than 1 of the other 4 years-
Operations16322%5% 6 a day, the most in 5 years-
Operator, other11716%7% 4 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)153
M2Delay due to ATO / ETCS equipment65
M0Confirmed train cab based safety system fault (including GSMR)64
MPRail / wheel interface, adhesion problems (including ice on the running rail)57
Q3NZ Pumps T57
VHPassenger Communication cord, door egress or emergency train alarm operated46
MDTechnical failures below the solebar42
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)23
OUDelays not Investigated by Network Rail23
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)22
Since 2018
CodeWhat Network Rail loggedMinutes
I6Delays as a result of line blocks / track patrols (including late handback)2,445
MUDepot operating problem2,384
M7Door and Door system faults2,142
TGDriver1,696
IBPoints failure (including no fault found)1,486
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)1,426
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,326
M0Confirmed train cab based safety system fault (including GSMR)1,311
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,268
MDTechnical failures below the solebar1,192