Rainford
62 delay minutes
Most of the delay picked up at Rainford in the four weeks to 9 December 2023 came from signal, points and power faults.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 56 | 90% | 16% | 2 |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | 1 |
| External | 5 | 8% | 4% | - |
| Network management | 1 | 2% | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JT | Points failure caused by snow or frost where heaters are not fitted | 56 |
| XP | BRIDGE HIT | 5 |
| ZY | Univestigated station overtime System Roll-up Only | 1 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 119 |
| MD | Technical failures below the solebar | 99 |
| M7 | Door and Door system faults | 93 |
| TG | Driver | 84 |
| TH | (Senior) Conductor/Train Manager | 79 |
| M8 | Technical failures above the Solebar | 72 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 71 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 62 |
| JT | Points failure caused by snow or frost where heaters are not fitted | 56 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 53 |