62 delay minutes

Most of the delay picked up at Rainford in the four weeks to 9 December 2023 came from signal, points and power faults.

0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power5690%16%2
Weather and structures--7%-
Autumn--7%1
External58%4%-
Network management12%17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JTPoints failure caused by snow or frost where heaters are not fitted56
XPBRIDGE HIT5
ZYUnivestigated station overtime System Roll-up Only1
Since 2018
CodeWhat Network Rail loggedMinutes
MNBrake and brake systems faults; including wheel flats where no other cause had been identified119
MDTechnical failures below the solebar99
M7Door and Door system faults93
TGDriver84
TH(Senior) Conductor/Train Manager79
M8Technical failures above the Solebar72
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure71
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)62
JTPoints failure caused by snow or frost where heaters are not fitted56
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps53