Rainham (London)
39 delay minutes
The biggest share (46%) of the delay picked up at Rainham (London) in the four weeks to 9 December 2023 came from faulty trains.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 16 | 41% | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 3 | 8% | 17% | - |
| The operators' causes | ||||
| Train faults | 18 | 46% | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | 2 | 5% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 18 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 16 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3 |
| RB | Passengers joining/alighting | 2 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 232 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 189 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 126 |
| FO | Time Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility) | 114 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 108 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 103 |
| RB | Passengers joining/alighting | 71 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 70 |
| XR | Cable vandalism or theft | 63 |
| XL | Fire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents) | 48 |