Romsey
1,743 delay minutes
The biggest share (31%) of the delay picked up at Romsey in the four weeks to 9 December 2023 came from how the network was run.
88% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 126 | 7% | 8% | 5 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 271 | 16% | 16% | 10 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 42 | 2% | 7% | 2 a day, more than 1 of the other 4 years | - |
| Autumn | 155 | 9% | 7% | 6 a day, more than 2 of the other 4 years | - |
| External | 80 | 5% | 4% | 3 a day, more than 2 of the other 4 years | - |
| Network management | 539 | 31% | 17% | 19 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 221 | 13% | 16% | 8 a day, more than 3 of the other 4 years | 11 |
| Traincrew | 66 | 4% | 11% | 2 a day, the least in 5 years | 1 |
| Stations | 48 | 3% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 66 | 4% | 5% | 2 a day, the most in 5 years | 1 |
| Operator, other | 131 | 7% | 7% | 5 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 124 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 104 |
| Q3 | NZ Pumps T | 99 |
| TT | Leaf fall Neutral | 99 |
| MD | Technical failures below the solebar | 82 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 79 |
| II | Signalling lineside cable fault | 76 |
| OM | Technical failure associated with a Railhead conditioning train | 76 |
| IB | Points failure (including no fault found) | 74 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 62 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 7,239 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,168 |
| IC | Track circuit failure (including no fault found) | 2,567 |
| MD | Technical failures below the solebar | 2,138 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,978 |
| TG | Driver | 1,929 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,854 |
| IB | Points failure (including no fault found) | 1,689 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,623 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 1,443 |