Leaves on the Line

Romsey

ROM Wessex route
CSV JSON

1,743 delay minutes

The biggest share (31%) of the delay picked up at Romsey in the four weeks to 9 December 2023 came from how the network was run.

88% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1267%8% 5 a day, more than 3 of the other 4 years-
Signals, points and power27116%16% 10 a day, more than 2 of the other 4 years1
Weather and structures422%7% 2 a day, more than 1 of the other 4 years-
Autumn1559%7% 6 a day, more than 2 of the other 4 years-
External805%4% 3 a day, more than 2 of the other 4 years-
Network management53931%17% 19 a day, more than 3 of the other 4 years-
The operators' causes
Train faults22113%16% 8 a day, more than 3 of the other 4 years11
Traincrew664%11% 2 a day, the least in 5 years1
Stations483%3% 2 a day, more than 1 of the other 4 years-
Operations664%5% 2 a day, the most in 5 years1
Operator, other1317%7% 5 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)124
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.104
Q3NZ Pumps T99
TTLeaf fall Neutral99
MDTechnical failures below the solebar82
OCSignaller including mis-routing (not ERTM /ETCS related)79
IISignalling lineside cable fault76
OMTechnical failure associated with a Railhead conditioning train76
IBPoints failure (including no fault found)74
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)62
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.7,239
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,168
ICTrack circuit failure (including no fault found)2,567
MDTechnical failures below the solebar2,138
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,978
TGDriver1,929
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,854
IBPoints failure (including no fault found)1,689
OCSignaller including mis-routing (not ERTM /ETCS related)1,623
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)1,443