Rowley Regis
598 delay minutes
The biggest share (24%) of the delay picked up at Rowley Regis in the four weeks to 9 December 2023 came from traincrew problems.
60% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 7 | 1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 92 | 15% | 16% | 3 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 52 | 9% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 65 | 11% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 52 | 9% | 17% | 2 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 60 | 10% | 16% | 2 a day, the least in 5 years | - |
| Traincrew | 141 | 24% | 11% | 5 a day, more than 1 of the other 4 years | - |
| Stations | 37 | 6% | 3% | 1 a day, the least in 5 years | - |
| Operations | 14 | 2% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 78 | 13% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 135 |
| IB | Points failure (including no fault found) | 59 |
| XP | BRIDGE HIT | 44 |
| Q3 | NZ Pumps T | 41 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 39 |
| TT | Leaf fall Neutral | 36 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 28 |
| M8 | Technical failures above the Solebar | 27 |
| MD | Technical failures below the solebar | 19 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 15 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 5,583 |
| IC | Track circuit failure (including no fault found) | 3,447 |
| MD | Technical failures below the solebar | 2,935 |
| ZU | No Cause Identified After investigation by both Parties | 2,670 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,546 |
| TH | (Senior) Conductor/Train Manager | 2,242 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,242 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,056 |
| IA | Signal failure (including no fault found) | 1,596 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 1,457 |