598 delay minutes

The biggest share (24%) of the delay picked up at Rowley Regis in the four weeks to 9 December 2023 came from traincrew problems.

60% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track71%8% 0 a day, the least in 5 years-
Signals, points and power9215%16% 3 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn529%7% 2 a day, more than 2 of the other 4 years-
External6511%4% 2 a day, more than 3 of the other 4 years-
Network management529%17% 2 a day, the least in 5 years-
The operators' causes
Train faults6010%16% 2 a day, the least in 5 years-
Traincrew14124%11% 5 a day, more than 1 of the other 4 years-
Stations376%3% 1 a day, the least in 5 years-
Operations142%5% 1 a day, more than 3 of the other 4 years-
Operator, other7813%7% 3 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver135
IBPoints failure (including no fault found)59
XPBRIDGE HIT44
Q3NZ Pumps T41
MPRail / wheel interface, adhesion problems (including ice on the running rail)39
TTLeaf fall Neutral36
RQUn-booked assistance for a person with reduced mobility joining/alighting,28
M8Technical failures above the Solebar27
MDTechnical failures below the solebar19
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure15
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver5,583
ICTrack circuit failure (including no fault found)3,447
MDTechnical failures below the solebar2,935
ZUNo Cause Identified After investigation by both Parties2,670
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,546
TH(Senior) Conductor/Train Manager2,242
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,242
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,056
IASignal failure (including no fault found)1,596
RQUn-booked assistance for a person with reduced mobility joining/alighting,1,457