Leaves on the Line

Rose Grove

RSG North West route
CSV JSON

50 delay minutes

The biggest share (44%) of the delay picked up at Rose Grove in the four weeks to 9 December 2023 came from signal, points and power faults.

68% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power2244%16%5
Weather and structures--7%-
Autumn35%7%-
External--4%-
Network management1223%17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other1428%7%1

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)22
Q1Takeback Pumps12
VZOther passenger or external causes the responsibility of TOC12
Q3NZ Pumps T3
TTLeaf fall Neutral3
Since 2018
CodeWhat Network Rail loggedMinutes
QAWTT schedule and or LTP Process including erroneous simplifiers88
TGDriver67
IBPoints failure (including no fault found)43
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)40
TRTrain Operating Company Directive15
Q1Takeback Pumps12
VZOther passenger or external causes the responsibility of TOC12
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)8
Q3NZ Pumps T7
M7Door and Door system faults5