Rose Hill Marple
322 delay minutes
The biggest share (22%) of the delay picked up at Rose Hill Marple in the four weeks to 9 December 2023 came from autumn leaves.
90% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 37 | 11% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 19 | 6% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | 19 | 6% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 70 | 22% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, the least in 5 years | 1 |
| Network management | 53 | 16% | 17% | 2 a day, more than 1 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 56 | 17% | 16% | 2 a day, more than 1 of the other 4 years | 3 |
| Traincrew | 29 | 9% | 11% | 1 a day, more than 1 of the other 4 years | 2 |
| Stations | 10 | 3% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 5 | 2% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 22 | 7% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 38 |
| M9 | Reported fleet equipment defect - no fault found | 25 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 20 |
| MU | Depot operating problem | 19 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 18 |
| QI | Cautioning due to railhead leaf contamination | 18 |
| TH | (Senior) Conductor/Train Manager | 16 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 15 |
| Q3 | NZ Pumps T | 14 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 13 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,483 |
| MD | Technical failures below the solebar | 1,320 |
| IC | Track circuit failure (including no fault found) | 709 |
| TH | (Senior) Conductor/Train Manager | 620 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 609 |
| M7 | Door and Door system faults | 594 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 590 |
| RB | Passengers joining/alighting | 456 |
| M8 | Technical failures above the Solebar | 443 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 426 |