609 delay minutes

The biggest share (26%) of the delay picked up at Rochester in the four weeks to 9 December 2023 came from how the network was run.

61% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track234%8% 1 a day, more than 1 of the other 4 years1
Signals, points and power478%16% 2 a day, the least in 5 years2
Weather and structures173%7% 1 a day, more than 3 of the other 4 years1
Autumn8915%7% 3 a day, more than 2 of the other 4 years-
External3<1%4% 0 a day, the least in 5 years-
Network management16126%17% 6 a day, more than 2 of the other 4 years1
The operators' causes
Train faults579%16% 2 a day, the least in 5 years2
Traincrew7412%11% 3 a day, more than 2 of the other 4 years5
Stations112%3% 0 a day, more than 1 of the other 4 years-
Operations224%5% 1 a day, the most in 5 years-
Operator, other10517%7% 4 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T89
TTLeaf fall Neutral89
MNBrake and brake systems faults; including wheel flats where no other cause had been identified51
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)33
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)31
TH(Senior) Conductor/Train Manager31
TGDriver30
ICTrack circuit failure (including no fault found)29
OCSignaller including mis-routing (not ERTM /ETCS related)25
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.22
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver2,486
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,415
IBPoints failure (including no fault found)2,039
J3Axle Counter Failure1,807
IISignalling lineside cable fault1,519
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,400
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,339
XPBRIDGE HIT1,337
VHPassenger Communication cord, door egress or emergency train alarm operated1,289
IHPower Supply And Distribution System Failure1,227