Rochester
609 delay minutes
The biggest share (26%) of the delay picked up at Rochester in the four weeks to 9 December 2023 came from how the network was run.
61% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 23 | 4% | 8% | 1 a day, more than 1 of the other 4 years | 1 |
| Signals, points and power | 47 | 8% | 16% | 2 a day, the least in 5 years | 2 |
| Weather and structures | 17 | 3% | 7% | 1 a day, more than 3 of the other 4 years | 1 |
| Autumn | 89 | 15% | 7% | 3 a day, more than 2 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 161 | 26% | 17% | 6 a day, more than 2 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 57 | 9% | 16% | 2 a day, the least in 5 years | 2 |
| Traincrew | 74 | 12% | 11% | 3 a day, more than 2 of the other 4 years | 5 |
| Stations | 11 | 2% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 22 | 4% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 105 | 17% | 7% | 4 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 89 |
| TT | Leaf fall Neutral | 89 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 51 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 33 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 31 |
| TH | (Senior) Conductor/Train Manager | 31 |
| TG | Driver | 30 |
| IC | Track circuit failure (including no fault found) | 29 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 25 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 22 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,486 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,415 |
| IB | Points failure (including no fault found) | 2,039 |
| J3 | Axle Counter Failure | 1,807 |
| II | Signalling lineside cable fault | 1,519 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,400 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,339 |
| XP | BRIDGE HIT | 1,337 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 1,289 |
| IH | Power Supply And Distribution System Failure | 1,227 |