The biggest share (28%) of the delay picked up at Rugby in the four weeks to 9 December 2023 came from signal, points and power faults.

59% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track681%8% 2 a day, the least in 5 years-
Signals, points and power1,54028%16% 55 a day, the most in 5 years5
Weather and structures4618%7% 16 a day, more than 2 of the other 4 years-
Autumn24<1%7% 1 a day, the least in 5 years-
External19<1%4% 1 a day, the least in 5 years-
Network management1,19521%17% 43 a day, the most in 5 years6
The operators' causes
Train faults1,08219%16% 39 a day, more than 3 of the other 4 years9
Traincrew64712%11% 23 a day, more than 3 of the other 4 years29
Stations942%3% 3 a day, more than 1 of the other 4 years-
Operations2214%5% 8 a day, the most in 5 years1
Operator, other2414%7% 9 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IHPower Supply And Distribution System Failure869
TGDriver550
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards534
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)386
M8Technical failures above the Solebar341
IBPoints failure (including no fault found)275
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive197
INHABD/Panchex/WILD/Wheelchex fault, failure or mis-detection153
Q1Takeback Pumps123
MNBrake and brake systems faults; including wheel flats where no other cause had been identified117
Since 2018
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail20,011
TGDriver17,552
I1Overhead line/third rail defect13,466
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.13,160
IBPoints failure (including no fault found)9,974
J3Axle Counter Failure9,057
M8Technical failures above the Solebar7,749
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)7,723
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)7,352
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure7,114