5,590 delay minutes
The biggest share (28%) of the delay picked up at Rugby in the four weeks to 9 December 2023 came from signal, points and power faults.
59% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 68 | 1% | 8% | 2 a day, the least in 5 years | - |
| Signals, points and power | 1,540 | 28% | 16% | 55 a day, the most in 5 years | 5 |
| Weather and structures | 461 | 8% | 7% | 16 a day, more than 2 of the other 4 years | - |
| Autumn | 24 | <1% | 7% | 1 a day, the least in 5 years | - |
| External | 19 | <1% | 4% | 1 a day, the least in 5 years | - |
| Network management | 1,195 | 21% | 17% | 43 a day, the most in 5 years | 6 |
| The operators' causes | |||||
| Train faults | 1,082 | 19% | 16% | 39 a day, more than 3 of the other 4 years | 9 |
| Traincrew | 647 | 12% | 11% | 23 a day, more than 3 of the other 4 years | 29 |
| Stations | 94 | 2% | 3% | 3 a day, more than 1 of the other 4 years | - |
| Operations | 221 | 4% | 5% | 8 a day, the most in 5 years | 1 |
| Operator, other | 241 | 4% | 7% | 9 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IH | Power Supply And Distribution System Failure | 869 |
| TG | Driver | 550 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 534 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 386 |
| M8 | Technical failures above the Solebar | 341 |
| IB | Points failure (including no fault found) | 275 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 197 |
| IN | HABD/Panchex/WILD/Wheelchex fault, failure or mis-detection | 153 |
| Q1 | Takeback Pumps | 123 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 117 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 20,011 |
| TG | Driver | 17,552 |
| I1 | Overhead line/third rail defect | 13,466 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 13,160 |
| IB | Points failure (including no fault found) | 9,974 |
| J3 | Axle Counter Failure | 9,057 |
| M8 | Technical failures above the Solebar | 7,749 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 7,723 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 7,352 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 7,114 |