Leaves on the Line

Ryde Esplanade

RYD Private railways route
CSV JSON

24 delay minutes

Most of the delay picked up at Ryde Esplanade in the four weeks to 9 December 2023 came from problems at stations.

67% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults1042%16%-
Traincrew--11%-
Stations1458%3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar10
T2Delay at unstaffed station to non-DOO train8
RPPassenger dropped object whilst boarding/alighting from train and train delayed at TOC request6
Since 2018
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train301
TZOther Passenger Train Operating Company causes287
IASignal failure (including no fault found)204
R7Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts)131
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)123
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.122
TGDriver77
J3Axle Counter Failure69
IBPoints failure (including no fault found)67
MDTechnical failures below the solebar59