Ryde Esplanade
24 delay minutes
Most of the delay picked up at Ryde Esplanade in the four weeks to 9 December 2023 came from problems at stations.
67% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | 10 | 42% | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | 14 | 58% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 10 |
| T2 | Delay at unstaffed station to non-DOO train | 8 |
| RP | Passenger dropped object whilst boarding/alighting from train and train delayed at TOC request | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 301 |
| TZ | Other Passenger Train Operating Company causes | 287 |
| IA | Signal failure (including no fault found) | 204 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 131 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 123 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 122 |
| TG | Driver | 77 |
| J3 | Axle Counter Failure | 69 |
| IB | Points failure (including no fault found) | 67 |
| MD | Technical failures below the solebar | 59 |