Leaves on the Line

Rye

RYE Kent route
CSV JSON

1,095 delay minutes

Most of the delay picked up at Rye in the four weeks to 9 December 2023 came from signal, points and power faults.

47% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track10<1%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power68062%16% 24 a day, the most in 5 years1
Weather and structures202%7% 1 a day, the most in 5 years-
Autumn151%7% 1 a day, more than 3 of the other 4 years-
External262%4% 1 a day, the most in 5 years-
Network management20919%17% 7 a day, the most in 5 years2
The operators' causes
Train faults484%16% 2 a day, more than 2 of the other 4 years-
Traincrew323%11% 1 a day, the least in 5 years-
Stations6<1%3% 0 a day, more than 2 of the other 4 years-
Operations10<1%5% 0 a day, more than 1 of the other 4 years-
Operator, other394%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IGBlock failure525
IKTelecom equipment failure (including no fault found)65
J0Telecom equipment radio failure (GSM-R)52
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)50
OCSignaller including mis-routing (not ERTM /ETCS related)45
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)44
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)37
M0Confirmed train cab based safety system fault (including GSMR)27
I9Fires starting on Network Rail Infrastructure23
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive23
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,652
TGDriver3,117
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,560
ICTrack circuit failure (including no fault found)1,001
IGBlock failure949
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles807
OCSignaller including mis-routing (not ERTM /ETCS related)724
M8Technical failures above the Solebar560
IBPoints failure (including no fault found)549
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure523