Rye
1,095 delay minutes
Most of the delay picked up at Rye in the four weeks to 9 December 2023 came from signal, points and power faults.
47% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 10 | <1% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 680 | 62% | 16% | 24 a day, the most in 5 years | 1 |
| Weather and structures | 20 | 2% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 15 | 1% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 26 | 2% | 4% | 1 a day, the most in 5 years | - |
| Network management | 209 | 19% | 17% | 7 a day, the most in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 48 | 4% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Traincrew | 32 | 3% | 11% | 1 a day, the least in 5 years | - |
| Stations | 6 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 10 | <1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 39 | 4% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IG | Block failure | 525 |
| IK | Telecom equipment failure (including no fault found) | 65 |
| J0 | Telecom equipment radio failure (GSM-R) | 52 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 50 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 45 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 44 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 37 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 27 |
| I9 | Fires starting on Network Rail Infrastructure | 23 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 23 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,652 |
| TG | Driver | 3,117 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,560 |
| IC | Track circuit failure (including no fault found) | 1,001 |
| IG | Block failure | 949 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 807 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 724 |
| M8 | Technical failures above the Solebar | 560 |
| IB | Points failure (including no fault found) | 549 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 523 |