116 delay minutes

The biggest share (35%) of the delay picked up at St Albans Abbey in the four weeks to 9 December 2023 came from autumn leaves.

66% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1210%8% 0 a day, the most in 5 years1
Signals, points and power33%16% 0 a day, the most in 5 years9
Weather and structures--7% 0 a day, the least in 5 years-
Autumn4135%7% 1 a day, the most in 5 years9
External--4% 0 a day, the least in 5 years-
Network management2824%17% 1 a day, more than 3 of the other 4 years-
The operators' causes
Train faults--16% 0 a day, the least in 5 years-
Traincrew109%11% 0 a day, more than 2 of the other 4 years2
Stations--3% 0 a day, the least in 5 years-
Operations54%5% 0 a day, the most in 5 years1
Operator, other1715%7% 1 a day, the most in 5 years3

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T31
OCSignaller including mis-routing (not ERTM /ETCS related)27
TTLeaf fall Neutral14
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.12
QJSpecial working for leaf-fall track circuit operation10
TGDriver7
TATrain-crew/loco/stock/unit diagram issues5
I4OHLE/third rail power supply failure or reduction3
TH(Senior) Conductor/Train Manager3
VETicket irregularities or refusals to pay3
Since 2018
CodeWhat Network Rail loggedMinutes
JHCritical Rail Temperature speeds, (other than buckled rails)1,917
TGDriver998
VWSevere weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions573
TH(Senior) Conductor/Train Manager525
IHPower Supply And Distribution System Failure336
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)318
MPRail / wheel interface, adhesion problems (including ice on the running rail)167
IRBroken/cracked/twisted/buckled/flawed rail164
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive163
I2AC/DC trip (including no fault or cause found)160