St Albans Abbey
116 delay minutes
The biggest share (35%) of the delay picked up at St Albans Abbey in the four weeks to 9 December 2023 came from autumn leaves.
66% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 12 | 10% | 8% | 0 a day, the most in 5 years | 1 |
| Signals, points and power | 3 | 3% | 16% | 0 a day, the most in 5 years | 9 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 41 | 35% | 7% | 1 a day, the most in 5 years | 9 |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 28 | 24% | 17% | 1 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 10 | 9% | 11% | 0 a day, more than 2 of the other 4 years | 2 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 5 | 4% | 5% | 0 a day, the most in 5 years | 1 |
| Operator, other | 17 | 15% | 7% | 1 a day, the most in 5 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 31 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 27 |
| TT | Leaf fall Neutral | 14 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 12 |
| QJ | Special working for leaf-fall track circuit operation | 10 |
| TG | Driver | 7 |
| TA | Train-crew/loco/stock/unit diagram issues | 5 |
| I4 | OHLE/third rail power supply failure or reduction | 3 |
| TH | (Senior) Conductor/Train Manager | 3 |
| VE | Ticket irregularities or refusals to pay | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 1,917 |
| TG | Driver | 998 |
| VW | Severe weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions | 573 |
| TH | (Senior) Conductor/Train Manager | 525 |
| IH | Power Supply And Distribution System Failure | 336 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 318 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 167 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 164 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 163 |
| I2 | AC/DC trip (including no fault or cause found) | 160 |