Leaves on the Line

St Albans City

SAC East Midlands route
CSV JSON

6,308 delay minutes

The biggest share (29%) of the delay picked up at St Albans City in the four weeks to 9 December 2023 came from how the network was run.

79% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track4858%8% 17 a day, more than 2 of the other 4 years-
Signals, points and power1,18319%16% 42 a day, the most in 5 years15
Weather and structures2474%7% 9 a day, the most in 5 years2
Autumn2935%7% 10 a day, the most in 5 years-
External1222%4% 4 a day, more than 1 of the other 4 years1
Network management1,80529%17% 64 a day, more than 3 of the other 4 years42
The operators' causes
Train faults5649%16% 20 a day, more than 2 of the other 4 years-
Traincrew90714%11% 32 a day, more than 3 of the other 4 years33
Stations1052%3% 4 a day, more than 3 of the other 4 years-
Operations30<1%5% 1 a day, the least in 5 years-
Operator, other5699%7% 20 a day, the most in 5 years3

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver805
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)378
J3Axle Counter Failure332
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)326
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure283
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.275
M8Technical failures above the Solebar259
ICTrack circuit failure (including no fault found)250
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)208
V8Train striking or being struck by a bird202
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver37,629
M8Technical failures above the Solebar25,559
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.22,249
ICTrack circuit failure (including no fault found)12,393
IBPoints failure (including no fault found)11,545
OCSignaller including mis-routing (not ERTM /ETCS related)9,993
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)9,798
IRBroken/cracked/twisted/buckled/flawed rail8,989
I1Overhead line/third rail defect8,889
TITraincrew rostering problem8,402