6,308 delay minutes
The biggest share (29%) of the delay picked up at St Albans City in the four weeks to 9 December 2023 came from how the network was run.
79% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 485 | 8% | 8% | 17 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 1,183 | 19% | 16% | 42 a day, the most in 5 years | 15 |
| Weather and structures | 247 | 4% | 7% | 9 a day, the most in 5 years | 2 |
| Autumn | 293 | 5% | 7% | 10 a day, the most in 5 years | - |
| External | 122 | 2% | 4% | 4 a day, more than 1 of the other 4 years | 1 |
| Network management | 1,805 | 29% | 17% | 64 a day, more than 3 of the other 4 years | 42 |
| The operators' causes | |||||
| Train faults | 564 | 9% | 16% | 20 a day, more than 2 of the other 4 years | - |
| Traincrew | 907 | 14% | 11% | 32 a day, more than 3 of the other 4 years | 33 |
| Stations | 105 | 2% | 3% | 4 a day, more than 3 of the other 4 years | - |
| Operations | 30 | <1% | 5% | 1 a day, the least in 5 years | - |
| Operator, other | 569 | 9% | 7% | 20 a day, the most in 5 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 805 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 378 |
| J3 | Axle Counter Failure | 332 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 326 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 283 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 275 |
| M8 | Technical failures above the Solebar | 259 |
| IC | Track circuit failure (including no fault found) | 250 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 208 |
| V8 | Train striking or being struck by a bird | 202 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 37,629 |
| M8 | Technical failures above the Solebar | 25,559 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 22,249 |
| IC | Track circuit failure (including no fault found) | 12,393 |
| IB | Points failure (including no fault found) | 11,545 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 9,993 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 9,798 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 8,989 |
| I1 | Overhead line/third rail defect | 8,889 |
| TI | Traincrew rostering problem | 8,402 |